Service Cases

In the recent 8 years, we participated in a series of major national engineering projects, including China's 863 project, the 6th generation offshore oil drilling platform, the third AP1000 nuclear power plant 220kV reverse feeding load test service in Sanmen, Zhejiang. We offered a full set of technical testing service plan for costromers at home and abroad from ship, oil, nuclear power, thermal power, eletric, shipyard and so on, and saved the time and money for employing international experts for them, and recieved unanimous praise.


January 2009, ocean 202 pipe-laying ship

May 2009, cylindrical petroleum drilling platform, Norway

October 2009, 4400t floating pipe-laying ship, Iran

November 2009, 2000t No.1 shallow pipe-laying ship

December 2009, 3000t dredging floating crane

March 2010, 2000t No.2 shallow pipe-laying ship

May 2010, semi-submersible petroleum handling ship

August 2011, offshore oil drilling platform of the sixth generation

August 2010, ocean sixth generation deepwater oil pipe-laying ship

October 2010, 2000t No.3 shallow pipe-laying ship

March 2012, offshore oil drilling platform of the sixth generation

March 2012, maring sixth generation oil drilling auxilliary geophysical prospecting ship

May 2011, 2 offshore oil drilling platforms, Norway

April 2012, Daewoo 8000t floating crane, South Korea

August 2013, 2000t No.4 shallow pipe-laying ship

August 2013, 4200t floating crane, Abu Dhabi, the United Arab Emirates

July 2013, ZPMC 12000t floating crane