English | 中文版
2009
January, SLBH was founded and registered in Shanghai Zhangjiang High Technology Park.
August, Consulted by Shanghai Technical Novelty Consulting Center of Chinese Academy of Science, the "Comprehensive Load Test Device for Large Power Generating Set", developing by SLBH, won the conclusion of "This project has novelty and important technical innovation in product technology design and comprehensive test function".
2010
April, SLBH undertook the technical service of the comprehensive load test for the power system of 8000t crane ship of Deawoo, South Korea.
2011
March, SLBH undertook the service of the load test for the power system of the generator of deepwar semi submersible drilling platform entrusted by Shanghai Waigaoqiao Shipyard.
2012
February, SLBH undertook the service of the load test for the third generation of nuclear power plant 220kV reverse feeding in Sanmen, Zhejiang.
2013
July, SLBH undertook the service of the comprehensive load test for the power system of 12000t floating crane entrusted by CNOOC.
December, SLBH successfully developed the 2500 comprehensive electromechanical load bank for power system of naval architecture and marine engineering.
2014
December, SLBH accomplished the test before delivery of the 2500 comprehensive electromechanical load bank for power system of naval architecture and marine engineering.
2015
June, the 2500 comprehensive electromechanical load bank for power system of naval architecture and marine engineering developed by SLBH passed the product qualification test organized by the 704 Institute of China Shipbuilding Industry Corporation(CSIC).